2023.08.04

Access / Vehicle Restrictions

Take a mountain bus or drive your own car to the trail head of each of the four trails.

  • Yoshida Trail
  • Subashiri Trail
  • Gotemba Trail
  • Fujinomiya Trail
  • Vehicle Restrictions

Yoshida Trail

<By Bus>
Fujisan Station (Fujikyu Railway)
Kawaguchiko Station  (Fujikyu Railway)
Fusan Parking (Fujikyu Bus *Summer only)
    ↓    Mountain Bus
Fuji-Subaru Line 5th Station
 Shinjuku Expressway Bus Terminal / Yokohama Sta.
Hiyoshi Sta. / Center Kita sta. / Tama Plaza / Ichigao Sta.
    ↓    Expressway Bus
Fuji-Subaru Line 5th Station
<By Car>
Kawaguchiko Interchange on the Chuo Expressway
Fujiyoshida Interchange on the Higashi Fujigoko Toll Road
          ↓
Fuji-Subaru Line
*It is not open 24 hours a day during the mountain-opening period.
  Please note the business hours.
↓ Toll Road
Fuji-Subaru Line 5th Station

Subashiri Trail

<By bus>

Gotemba Station (JR Gotemba Line)
Shinmatsuda Station (Odakyu Line )
     ↓    Mountain Bus
Subashiri Trail 5th Station

<By Car>
Periods other than those listed below  
Subashiri Interchange on the Higashi Fujigoko Toll Road
Fuji-azami Line
Subashiri 5th Station

From July 14 to August 27
From September 1 to September 3
From September 8 to September 10
Subashiri Interchange on the Higashi Fujigoko Toll Road
         ↓
 Michinoeki Subashiri   Change the shuttle bus for Subashiri 5th Station
※6AM to 5PM(Michinoeki To Subashiri 5th Station   Every 60 min) one way 1220yen,round trip 1830yen
※ 6:45AM to 5:45PM(5th Station to Michinoeki   Every 60 min)
         ↓
Subashiri 5th Station

Gotemba Trail

<By Bus>
Gotemba Station (JR Gotemba Line)
      ↓  Mountain Bus
Gotemba Trail New 5th Station
<By Car>
Subashiri Interchange on the Higashi Fujigoko Toll Road
Gotemba Interchange on the Tomei Expressway
  R138
Gotemba-Fuji Park Line
Mt.Fuji Skyline
Gotemba New 5th Station

Fujinomiya Trail



<By Bus>

Mishima Station / Shin-Fuji Station (JR Shinkansen Line)
Fuji Station (JR Tokaido Line) 
Fujinomiya Station (JR Minobu Line)
↓  Mountain Bus
Fujinomiya 5th Station


Shizuoka Station (JR Tokaido Line)  
 ↓  Expressway  Bus
Fujinomiya 5th Station
 
<By Car>
        Until July 9, After September 11
 
Gotemba Interchange on the Tomei Expressway
Susono Interchange on the Tomei Expressway
Mt. Fuji Skyline
Fujinomiya 5th Station

Fuji Interchange on the Tomei Highway
Shinfuji Interchange on the Shin-tomei Highway
Nishi-Fuji Toll Road
R139
Mt. Fuji Skyline
Fujinomiya 5th Station

From July 10 to September 10
Gotemba Interchange on the Tomei Expressway
Susono Interchange on the Tomei Expressway
Mizugatsuka parking lot   Change the shuttle bus for Fujinomiya 5th Station
※6AM to 5PM(Mizugatsuka parking lot to Fujinomiya 5th station Every 60 min one way 1170yen, round trip 2000yen)
※7AM to 6PM(Fujinomiya 5th station to Mizugatsuka parking lot Every 60 min)
Fujinomiya 5th Station 
      
Fuji Interchange on the Tomei Highway
Shinfuji Interchange on the Shin-tomei Highway
                  ↓
Mizugatsuka parking lot   Change the shuttle bus for Fujinomiya 5th Station
※6AM to 5PM(Mizugatsuka parking lot to Fujinomiya 5th station Every 60 min one way 1170yen, round trip 2000yen)
※7AM to 6PM(Fujinomiya 5th station to Mizugatsuka parking lot Every 60 min)
Fujinomiya 5th Station 

 
 

Temporary Vehicle Regulations

【!】If you are planning to drive your own car, check the periods of passenger car traffic restriction.

  • During the period in which restriction is in place, you need to take the shuttle bus to the 5th station from the parking area at the foot of the mountain.
  • There are no restrictions on passenger car traffic for the Gotemba Trail.
  • Check the the period and section of passenger car traffic restriction and the information on the parking area and the shuttle bus during the restriction period.

     

*This restriction does not apply to following vehicles.
  • Buses (including mini buses with a capacity of more than 10 passengers)
  • Limousine taxies
  • Electric car / Fuel Cell Vehicle (Only Fuji Subaru Line* and Fuji Azami Line)
       * You need to get a proof of confirmation at Fujihokuroku Parking.
  • Bicycles 
  • Authorized vehicles
  • Vehicles with handicapped people 

The Period of Passenger Car Traffic Restriction in 2023

 Road   Restriction Period  Parking
Fuji-Subaru Line 
(Yoshida Trail)
July 14 6pm  - September 10 6pm Fujisan Parking
Fuji Azami Line
(Subashiri Trail)
July 14 noon - August 27 noon
September 1 noon - September 3 noon
September 8 noon - September 10 noon
Subashiri Versatile Square
Gotemba Trail No Restriction  
Mt.Fuji Skyline
(Fujinomiya Trail)
July 10 9am - September 10 6pm Mizugatsuka
Parking

Relation Site